top of page

Brigade Place

  • caterhamva
  • Jun 16, 2019
  • 1 min read

Residents will be aware that the central walkway originally laid with a material called Cedec has been slowly deteriorating over the years and at various times a resurfacing project has been discussed by some residents.

The VA has now commissioned a feasibility study to examine the options to resurface the area later this year and to consider whether replacement of some of the lime trees should be included as it is suspected that the sap from these trees is the cause of the surface deterioration. A summary of the results of the feasibility study will be placed on The Village Association website.

Also see news story about the Residents' Surgery to be held on 20th July in Brigade Place. Read it HERE


 
 

Recent Posts

See All
AGM Summary

The Village Association (VA) AGM was held on Wednesday 26 November 2025 at The Officers Mess, Coldstream Road. The meeting was attended by VA Directors and representatives from Anthem Management and t

 
 
Director Appeal - Update

We had an excellent response to our appeal for new directors to join the VA Board. Thank you to everyone who contacted us. As a result, we now have a number of residents who will be working with the V

 
 
Fly Tipping

Over the last year there has been a significant increase in fly-tipping. When fly-tipping starts - it rapidly spreads, and it does not take long for an enormous pile of rubbish to collect. Even an old

 
 

© 2023  The Village Association Limited

bottom of page